Yes.
1. Neighboring Clear Lake water systems:
2. Neighboring well water systems:
Not likely, or at least not cost effectively.
The Love’s Point Parcels A & B sit at the end of a ridge called Leubow Point. The wells on these parcels were purposely dug to approximately Clear Lake level.
A neighbor on Leubow Point recently dug a well. His first attempt failed because the shaft kept collapsing. His second attempt tapped the same colloidal clay contaminated water as the Love’s Point wells.
All three wells are deeper than 600 feet.
While is it is possible that better water might be found below the aquifer that the three existing wells tap, the risk and cost would be daunting.
It would be possible to dig a well on one or more of the lower Love’s Point Parcels D, E or F. But, nearby existing well have their own issues, namely boron content.
By every measure, the aquifer tapped by the Love’s Point wells is sourced, or shares the same source with nearby Thurston Lake. (LP water source)
There are two ranches located on the shore of Thurston Lake.

The Jorgenson’s reportedly use Thurston Lake water as is, and import their drinking water.
The Haldens have a sand filter treatment system.
The Thurston Lake water is
This system requires frequent backflushing of the sand filter
in a kind of three steps forward, two steps back approach
that produces only 1 gallon per minute of final product water.
Dunken pump provides us with an “preliminary” estimate for a treatment system to produce 5-7 gallons per minute by using a settling tank to drop out sediment before sand filtering.
Dunken’s recommended system might look something like this:

With sales tax Dunken “preliminarily” estimating $31,000
The Dunken estimate includes or does not include:
A more comprehensive system might look like this:


Water Systems Engineer
Tom Sawyer
707 546 7262
Tom is a freelance water system engineer
who comes highly recommended by Brock Dolman
of The Occidental Arts & Ecology Center Water InstituteTom’s offers expertise in designing and implementing
development of integrated water & power systems.When I spoke with Tom in September 2007 he expressed
disinterested in residential projects. But, real money and
commitment would likely pique his interest
Dunken Pump
Lakeport, CA
(707) 263-4486
Dunken Pump maintains the only equipment in Lake County
capable of serving a 600-700 foot well. They offer comprehensive
pump and water treatment systems services.
Dungeness Development Associates, Inc.
John Macpherson
206-730-5370
Specializing in construction run-off water treatment.
Dungeness offers expertise probably more suited to the Love’s
Point special water clarification needs than conventional water
purification companies (for example, Culligan could not help us).Dungeness supplies a chitosan flocculant product.
Vanson – HaloSource. Inc
Frank Knieb
602 334 3474
http://www.stormklear.com
Vanson supplies chitosan flocculant and offers
system design assistance. They recently provided
a dose analysis from a sample of the Love’s Point water.
See there report here.
No, not cost effectively.
• Simple filtration does not work because the colloidal clay is too finely grained. It either passed through the filter or clogs it too quickly.
• Sand filtration works because such filters allow for automated back flushing and work effectively with flocculation agents.
• Vanson has experimented with centrifugal filters, but found that the process breaks down the floc rendering it ineffective.
• There is a process called D.A.F. (dissolved air floatation) that would almost certainly replace the need for a settling tank and might reduce the demand for floc use. However, the D.A.F process would still require sand filtration for final clarification, and even a small D.A.F. unit would cost in excess of $50K alone.
http://www.harvestingrainwater.com/
Advantages
Require
The Love’s Point House is equipped with back-up Electric Power via
These are designed to provide uninterrupted power to the House during PG&E power failures. However, the automatic start up feature of the transfer switch is not presently working properly (Nov 2010), so during a power outage the generator would require manual start up.
The GenSet is not connected to the service buildings
or well water systems.
Short power failures are common during the year. In the last six years there has not been a failure longer than ~ 12 hours. During power outages the well pump and domestic water pressure pump must be connected to a portable, gasoline generator via a manual transfer switch.
The GenSet should be maintenance run for ~ 20 minutes each week. When the auto-transfer switch is working properly this weekly maintenance is run automatically, but presently it must be done manually.
This consumes a small amount of diesel fuel.
The GenSet is serviced annually
Real costs amortize to approximately $50 / month
Narrative & Menu: Love’s Point Maintenance
Previous: PG&E – Average monthly and total costs
Next: Propane – Appliances & Systems
Totals
Propane for House:
Propane for service buildings:
One 500 gallon propane tank serves the entire property, i.e. both House and service buildings. A flow meter could be installed on the propane line leg that branches to the House ( estimated cost ~ $200), thus allowing propane use to be separately deduced for the two locations. However, at present (Nov 2010), propane consumption at each separate location (House & service area) can only be estimated.

Narrative & Menu: Love’s Point Maintenance
Previous: Generator
Next: Propane – Average Monthly Cost
Totals
Love’s Point draws it’s water from a 660 ft well.

Narrative & Menu: Love’s Point Maintenance
Previous: Propane – Average Monthly Costs
Next: Water – Source-Well
Totals
You must be logged in to post a comment.